Terrazzo Tiles

Terrazzo tile models, which are one of the types of tile production, can also be called mosaic or tile tiles. It consists of two layers. The first is the wear layer on the products. This part is the layer consisting of paint, cement, marble dust, stone chips and crumbs. The lower squash of the models consists of cement and toothed sand material.

What are the Usage Areas of Tile?
It is used both as an interior design and as an exterior coating material. It is one of the most aesthetic and durable coating materials. As product types, productions can be named as painted and white cement, unpainted and normal cement, and productions made in the form of unpainted and white cement.

What are the Tile Terrazzo Application Stages?
The most important issue in floor coverings is a good environmental condition. It is an often overlooked step in resin flooring applications on concrete floors. These conditions are related to moisture or moisture movement, temperature and humidity of the floor to be applied.

Recommended article, carpet flooring price click here to get detailed information about it.

1- Ground Preparation
Since the seemingly simple process on unsuitable floors can turn into a long and difficult repair process, it should be determined whether the place is suitable for terrazzo by carefully and prioritizing the floor.

Mechanical preparation: Foreign materials such as dust and dirt must be removed mechanically to ensure good adhesion. The method of blasting and grinding using claw scraping is the most effective method of preparing the existing concrete.

Weathered concrete: Old concrete surfaces must be in good structural condition. The stage before proceeding to the resin flooring application is to repair the worn areas. Material residues are removed by rough blasting, sandblasting, ball blasting or grinding processes by scraping the existing paints, crusty and loose concrete.

New concrete: It should be kept for a minimum of 28 days by making maintenance before coating. Maintenance aids and sealants should not be used before coating. It is sufficient to smooth the concrete surface with a steel trowel.

Before starting the application, the surface should be checked for moisture. Care should be taken to carry out a moisture vapor transport test.

2- Design
Aluminum or brass L-profile strips are used to apply the designs to the safe coating area. The strips are bent into shapes suitable for the design and mounted on the floor.

Since it does not have a jointed structure, it provides integrity in the areas where it is applied. For example, flat and wide areas are preferred in airports, hospitals, shopping malls.

After the application, it is expected to dry for 24-72 hours depending on the weather conditions. After the product dries, it is checked and the application teams are shaved 1.5-2 mm from the floor with the wiping machines and the fine polishing process is carried out. After shaving and wiping processes, polisher is applied on the floor and a lively appearance is provided.

models, which are one of the types of tile production, can also be called mosaic or tile tiles. It consists of two layers. The first is the wear layer on the products. This part is the layer consisting of paint, cement, marble dust, stone chips and crumbs. The lower squash of the models consists of cement and toothed sand material.

What are the Usage Areas of Tile?
It is used both as an interior design and as an exterior coating material. It is one of the most aesthetic and durable coating materials. As product types, productions can be named as painted and white cement, unpainted and normal cement, and productions made in the form of unpainted and white cement.

What are the Tile Terrazzo Application Stages?
The most important issue in floor coverings is a good environmental condition. It is an often overlooked step in resin flooring applications on concrete floors. These conditions are related to moisture or moisture movement, temperature and humidity of the floor to be applied.

1- Ground Preparation
Since the seemingly simple process on unsuitable floors can turn into a long and difficult repair process, it should be determined whether the place is suitable for terrazzo by carefully and prioritizing the floor.

Mechanical preparation: Foreign materials such as dust and dirt must be removed mechanically to ensure good adhesion. The method of blasting and grinding using claw scraping is the most effective method of preparing the existing concrete.

Weathered concrete: Old concrete surfaces must be in good structural condition. The stage before proceeding to the resin flooring application is to repair the worn areas. Material residues are removed by rough blasting, sandblasting, ball blasting or grinding processes by scraping the existing paints, crusty and loose concrete.

New concrete: It should be kept for a minimum of 28 days by making maintenance before coating. Maintenance aids and sealants should not be used before coating. It is sufficient to smooth the concrete surface with a steel trowel.

Before starting the application, the surface should be checked for moisture. Care should be taken to carry out a moisture vapor transport test.

2- Design
Aluminum or brass L-profile strips are used to apply the designs to the safe coating area. The strips are bent into shapes suitable for the design and mounted on the floor.

Since it does not have a jointed structure, it provides integrity in the areas where it is applied. For example, flat and wide areas are preferred in airports, hospitals, shopping malls.

After the application, it is expected to dry for 24-72 hours depending on the weather conditions. After the product dries, it is checked and the application teams are shaved 1.5-2 mm from the floor with the wiping machines and the fine polishing process is carried out. After shaving and wiping processes, polisher is applied on the floor and a lively appearance is provided.

Design a site like this with WordPress.com
Get started